Based on the definite maket demand, a model minimized average cost per time unit is considered and translated into a programming model with the fuzzy chance constrains.

 
  • 在確定需求的基礎上,建立了模糊需求下批量生產(chǎn)優(yōu)化模型,并將其轉化為模糊機會(huì )約束規劃模型。
今日熱詞
目錄 附錄 查詞歷史
国内精品美女A∨在线播放xuan