Based on the data of the spillway depression model and the prototype for Daochaoshan Hydroelectric Station,this paper analyses the problem of flow aeration to prevent cavitation on stepped spillway.

 
  • 根據大朝山水電站表孔減壓模型試驗資料,結合原型觀(guān)測有關(guān)資料,對臺階溢流壩摻氣減蝕的有關(guān)問(wèn)題進(jìn)行了分析研究。
今日熱詞
目錄 附錄 查詞歷史
国内精品美女A∨在线播放xuan