Based on the comprehensive analysis and comparison,we selected a optimum scheme from 3 design schemes from the equipment cost,the fixing and debuging of the unit,the investment of civil engineering and the drainage of foundation ditch of construction.
英
美
- 對南昌市前湖電排站3個(gè)設計方案分別從設備費用、機組安裝調試、土建投資、年運行費、施工基坑排水難易等方面綜合分析比較;選擇最優(yōu)方案.