All the tied booms of the main arch rids and stable rids combine the arch rids and roadway by the medial horizontal beam of the bridge deck system.The substructure adopts pier foundation.

 
  • 主拱肋和系梁在端橫梁處連成整體,主拱肋和穩定拱肋的所有吊桿通過(guò)橋面系的中橫梁把拱肋和橋面連接在一起,下部結構采用樁基。
今日熱詞
目錄 附錄 查詞歷史
国内精品美女A∨在线播放xuan