According to the condition of Datong network in 2004,this paper analyzes the N-1 breaking of 220 kV(transmission) line by the use of BPA power system analysis software,and then makes conclusion and proposes some suggestions.

 
  • 根據大同電網(wǎng)2004年狀況,用BPA電力系統分析軟件對大同電網(wǎng)220 kV線(xiàn)路進(jìn)行了N-1開(kāi)斷模擬分析,并根據分析結果做出了結論和建議。
今日熱詞
目錄 附錄 查詞歷史
国内精品美女A∨在线播放xuan