According to design, the lining with light air hardening pouring material was needed to lay onto convection chamber, chimney and the bottom of heater of catalytic reformed equipment.

 
  • 某石化總廠(chǎng)催化重整裝置,設計要求其中的加熱爐對流室、煙囪和爐底均采用氣硬性輕質(zhì)澆注料進(jìn)行襯里,為此對氣硬性輕質(zhì)澆注料進(jìn)行了研制。
今日熱詞
目錄 附錄 查詞歷史
国内精品美女A∨在线播放xuan