Abstract: Describes the issues in water priming,start-up,commissioning,daily operation and management of the central hot water heating system.Points out that water priming and the start-up of the system should be performed following correct procedures.

 
  • 文摘:敘述了集中熱水供暖系統(包括熱源、網(wǎng)路、熱用戶(hù))的充水、啟動(dòng)、初調節,以及日常運行管理中應注意的問(wèn)題,指出熱水供暖系統的充水和啟動(dòng)必須按照正確的程序進(jìn)行操作。
今日熱詞
目錄 附錄 查詞歷史
国内精品美女A∨在线播放xuan