Abstract: Concrete distributors in the South-to-North Water Diversion Project have solved concrete transporting in the inverted siphon tube, but the slopes construction has been constrained.

 
  • 摘 要: 混凝土布料機在舉世矚目的南水北調工程施工中,解決了倒虹吸水平管身段混凝土輸送問(wèn)題,但在斜坡段施工中受到了制約。
今日熱詞
目錄 附錄 查詞歷史
国内精品美女A∨在线播放xuan